After the extension of Monaco in 2019 and 2020 for Mareterra ( 18 caissons), Eiffage Génie Civil Marine demonstrates once again its deep expertise in completing this delicate offshore installation manoeuvre in open sea. The success of this milestone fully illustrates the 6 core values of the Eiffage group: leadership by example, courage, responsibility, trust, transparency, lucidity.
With the production and installation of the quarry materials that form the base of the breakwater from Mauritania, and the construction and load out of 5 concrete caissons in Senegal, Eiffage Génie Civil Marine has demonstrated its innovative and skilled methods of construction.
Congratulations to the project team led by Antoine Bidault with Dimitri Carliez managing the offshore operations.
Photo Credit : Eiffage Génie Civil
-
12.04.2024GPT Eiffage Civil Engineering Marine has reached an...On the project for the basin extension and renovation of the docks at the port of Cotonou, the teams from Eiffage Civil Engineering Marine have started driving the...
-
28.03.2024Eiffage Civil Engineering welcomed the 2027 class of...We had the pleasure of welcoming the 2027 class from ESITC Paris to the construction site of the future Stade de France station on Line 16!
-
27.03.2024In the heart of the Cantal, Eiffage Civil Engineering...Our teams are carrying out demolition, reinforcement, and earthmoving work on a wasteland located on the Cerf Rock, overlooking the Lioran ski resort.