12.05.2021
Low-carbon construction site in Nice
The Nice Saint-Augustin multimodal interchange project, awarded to Eiffage Génie Civil, in a consortium with Eiffage Construction, will be eco-responsible.
For the SNCF Gares & Connexions, the contracting authority, and the Nice Côte d'Azur metropolitan area, our teams, who are responsible for the earthworks/soil treatment/foundations/civil engineering/landscaping/landscaping work package, have proposed several low-carbon solutions.
The project, which will generate 41,000 m³ of cutting, will see the land reused for landscaping, the aggregates will be recovered by screening and, materials that cannot be upgraded, removed by rail freight. The rail will also be used to transport wooden slats for false ceilings, which are manufactured in the Netherlands, while the regional industry will be mobilized for the wooden framework of the passenger building. As for the concrete, the quantity of which has been limited, thanks to an optimization of the lengths of the rigid inclusions of soil reinforcement, it will be manufactured in local power stations, but with low carbon cement. Even the movements of the workers has been considered. They will come to the site by public transport!
-
12.04.2024GPT Eiffage Civil Engineering Marine has reached an...On the project for the basin extension and renovation of the docks at the port of Cotonou, the teams from Eiffage Civil Engineering Marine have started driving the...
-
28.03.2024Eiffage Civil Engineering welcomed the 2027 class of...We had the pleasure of welcoming the 2027 class from ESITC Paris to the construction site of the future Stade de France station on Line 16!
-
27.03.2024In the heart of the Cantal, Eiffage Civil Engineering...Our teams are carrying out demolition, reinforcement, and earthmoving work on a wasteland located on the Cerf Rock, overlooking the Lioran ski resort.