23.06.2021
Ævia on the RD 392 bridge at Herblay-Sur-Seine
Since March, Eiffage Génie Civil's Ævia teams have been carrying out repairs on the structure crossing the A15 freeway on behalf of the Val d'Oise County Council (CD 95). This is a turnkey project that calls on all of the brand's expertise.
On the program for this project under traffic :
- Changing 72 m of pavement joints in 7 nights
- Repair of 1,200 m² of wearing course in 2 nights
- Demolition and concreting of sidewalks
- Installation of asphalt on sidewalks
- Earthwork of the riprap and development of the flats
- Installation of access stairs under the structure
Next steps in July: securing the accesses under the structure, laying and repointing the stones on the riprap, demolition and reconstruction of the TPC, and jacking up the structure on the 3,300 ton abutments.
To contact our teams: https://www.eiffage-aevia.com/
Photos Credit: Alexis Toureau
-
12.04.2024GPT Eiffage Civil Engineering Marine has reached an...On the project for the basin extension and renovation of the docks at the port of Cotonou, the teams from Eiffage Civil Engineering Marine have started driving the...
-
28.03.2024Eiffage Civil Engineering welcomed the 2027 class of...We had the pleasure of welcoming the 2027 class from ESITC Paris to the construction site of the future Stade de France station on Line 16!
-
27.03.2024In the heart of the Cantal, Eiffage Civil Engineering...Our teams are carrying out demolition, reinforcement, and earthmoving work on a wasteland located on the Cerf Rock, overlooking the Lioran ski resort.