19.12.2022
In Le Havre (76), Tinel participates in the development of the Joannès Couvert quay
As part of the construction of a wind turbine blade manufacturing and assembly plant in Le Havre, our Tinel teams have been involved in the development of the Joannès Couvert wharf since May 2021.
A total of 16 hectares of platforms will be fitted out and strengthened to handle wind turbine components, which can be up to 100 metres long for pallets and 800 tonnes for heavy packages.
At the end of this adaptation work, the platform will have a storage capacity of 25 tons per square metre!
Credit: Atypix
-
12.04.2024GPT Eiffage Civil Engineering Marine has reached an...On the project for the basin extension and renovation of the docks at the port of Cotonou, the teams from Eiffage Civil Engineering Marine have started driving the...
-
28.03.2024Eiffage Civil Engineering welcomed the 2027 class of...We had the pleasure of welcoming the 2027 class from ESITC Paris to the construction site of the future Stade de France station on Line 16!
-
27.03.2024In the heart of the Cantal, Eiffage Civil Engineering...Our teams are carrying out demolition, reinforcement, and earthmoving work on a wasteland located on the Cerf Rock, overlooking the Lioran ski resort.