This deconstruction was conducted alongside the demolition of the neighboring "Mercure" building.
Both demolition projects are part of the urban renewal plan for the La Mosson district in Montpellier.
The project in numbers:
- 34,000 m² of interior stripping
- 33,000 tons of processed rubble
- 5,000 hours of social integration work
- 730 m of asbestos-cement pipes
- 660 tons of metals and scrap iron
- 360 tons of non-hazardous waste
- 70 tons of treated wood
98% of the materials from the demolitions were recycled.
This technical and logistical challenge was successfully carried out in partnership with ACM HABITAT (Project Owner) and Antea Group - France (Project Manager).
Congratulations to the Demcy teams for this collective success!
Credit: Occidrone
to discover also
-
26.11.2026On the Lot River, Ævia rehabilitates the Mercuès lock...A few kilometers north of Cahors, our Ævia teams have successfully completed an extraordinary project to secure the future of this historic structure, which generates... -
18.11.2026Toulouse Metro: Our TBM Jeanne Marvig has just achieved...Jeanne Marvig has just completed its third breakthrough at the future Saint-Martin - Airbus station. -
17.11.2026In Benin, Eiffage Génie Civil has completed and handed...At the Autonomous Port of Cotonou (PAC), our Eiffage Génie Civil teams have completed and handed over two new phases of work for the basin expansion and the renovation...