Technicentre

Villeneuve-Saint-Georges Technicentre: the rail hub of the future

The consortium led by Eiffage Génie Civil is designing, building and maintaining the Villeneuve Demain Technicentre, the future next-generation industrial complex dedicated to the RER D and Transilien R lines.

Behind the scenes at the VITEO construction site

Funded entirely by Ile-de-France Mobilités on behalf of SNCF Voyageurs, this comprehensive performance-based contract is transforming the historic site at Villeneuve-Saint-Georges (94).

The aim is to adapt the infrastructure to accommodate and maintain the trains of the future (RER NG and Regio 2N), benefiting nearly 700,000 daily passengers.

VITEO: a global Design-Build-Maintenance contract

To meet the requirements of this global Design-Build-Maintain contract, Eiffage Génie Civil acts as lead contractor for the consortium. The company is responsible for the overall project management, the management of technical interfaces and the coordination of all the Group’s specialist expertise deployed on site, whilst ensuring the continuity of rail services in the area.

Land reclamation and site development

To prepare the site, Eiffage Génie Civil is responsible for decontamination works and all major earthworks, as well as dry and wet utility networks.

  • Demcy, part of Eiffage Génie Civil, is carrying out the preliminary work involving selective demolition and the clearance of the old facilities.
  • Eiffage Route is responsible for constructing the heavy-duty roads and access platforms.

Construction of industrial buildings and the use of timber

Eiffage Génie Civil coordinates the construction of maintenance workshops and commercial buildings, including ancillary trades and interior fit-outs.

In order to significantly reduce the carbon footprint of the structures, the project draws on the expertise of Savare, a brand of Eiffage Construction, for the off-site manufacture and installation of timber frames and prefabricated timber components.

Installation of maintenance equipment and railway tracks

To equip this high-performance technical centre, Eiffage Rail is carrying out the complete installation of the railway tracks, overhead lines and industrial equipment, such as the automated in-pit lathe for machining wheels.

Eiffage Énergie Systèmes is overseeing the installation of signalling systems, high-voltage power systems (CFO), low-voltage power systems (CFA), HVAC (heating, ventilation and air conditioning) and plumbing.

Environmental Performance & Green Logistics

In line with the Eiffage Group’s low-carbon commitments, the construction project stands out for its rigorous eco-design approach, developed in collaboration with the architectural firm LA/BA.

  • Low-carbon concrete & bio-based materials: use of a dedicated concrete batching plant installed directly on site.
  • Innovative river transport: removal of 157,758 tonnes of excavated material by barge on the River Seine to minimise road traffic disruption in a densely populated urban area.
  • Water management: on-site water infiltration capacity designed to handle rainfall equivalent to a 30-year return period
  • On-site reuse: characterisation, sorting, processing and reuse of 243,290 tonnes of materials from demolition (crushed concrete, ballast, utility networks, excavated material)
  • Inclusive social programme: integration of 145,000 hours of work experience placements across the entire construction site to support local employment.

Innovation & Connected Technologies

Villeneuve Demain is paving the way for the maintenance centre of the future by incorporating cutting-edge industrial technologies:

  • Digital modelling: comprehensive project management using the BIM methodology.
  • Advanced connectivity: deployment of a private 5G communications network on site.
  • Robotic equipment: integration of a Centralised Control Centre (CCC), automated pit-based axle inspection towers, and automatic test benches.