25.03.2025
Ævia has jacked down the Sylvain Dupuis Bridge on the Brussels Ring Road.
After several months of preparation, Ævia’s teams successfully carried out the jacking down of the Sylvain Dupuis Bridge on the Brussels Ring Road on behalf of Bruxelles Mobilité - Brussel Mobiliteit.
- The operation was carried out using a Computer-Assisted Lifting (CAL) system, allowing precise control of the pressure and movement of 40 hydraulic jacks with capacities ranging from 45 to 250 tonnes.
- The jacking was performed at a height of 1.5 metres on specially dimensioned temporary supports.
- The bridge bearings were then replaced, followed by the jacking down phase.
A complex lifting operation successfully completed in partnership with INCYE Etaiements, Butonnages et Etançonnements.
to discover also
-
05.05.2025Eiffage Génie Civil sign the DÉCISION Chair with the...Officially launched Tuesday, April 29, 2025 this scientific chair is dedicated to the durability of reinforced concrete. -
24.03.2025In Le Havre (76), using the micro-tunnel boring machine...As part of an initiative to modernise and improve the reliability of the wastewater infrastructure of Le Havre Seine Métropole, our teams are currently working on... -
21.03.2025In the Yvelines region (78), Eiffage Génie Civil inaugurates...Since 2017, our Eiffage Génie Civil teams have been fully mobilized to design and build the new primary sedimentation unit at the Seine Aval wastewater treatment...